http://forkredit.com/ | Агротехника | Санкт Петербург | Все о Финляндии
A- A A+

Management


       

ORUDZHOV UZEIR SALEG OGLY

Deputy Chief Engineer - Mining

Phone: (+998 78) 141-93-91

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Reception day and hours: every Tuesday at 16:00

Biography

Born in 1960 in the Republic of Armenia.

Higher education. In 1981, graduated the Azerbaijanian oil and gas institute. Specialty be education – techniques and comprehensive mechanization of underground mining.

Labor activity

1981-1991 y - underground mining attendant at the section No. 3, senior attendant, No. 1 section Chief, No. 5 section Chief in the underground pit ‘Kochbulak’ of the production association ‘Uzbekzoloto’ under the Angrensky gold mine

1991-1992 y - attendant at the ‘Takhtarovka’ underground pit of the ‘Yenbek’ prospectors cooperative under the ‘Kazzoloto’ ore-dressing and processing enterprise

1992-1999 y - chief, chief engineer of the ‘Gornaya’ underground mine, chief engineer of the ‘Zarnitsa’ prospectors cooperative under the production association ‘Uzbekzoloto’

1999-2001 y - Chief Engineer of the Angrensky gold mine under the ‘Uzalmazzoloto’ association

2001-2002 y - Director of the Angrensky gold mine under the ‘Uzalmazzoloto’ association

2002-2007 y - Deputy Technical Director, Mining, of JSC “Almalyk MMC’

2007 – up to date Deputy Chief Engineer, Mining, of JSC “Almalyk MMC’

Duties:

  • Ensuring the fulfillment of industrial projection by JSC ‘Almalyk MMC’ mines relative to ore and metal mining, as well as to stripping, shaft-sinking and tunneling  and exploration works according to prescribed directions;
  • Ensuring the implementation of capital investment by the mines at a stated time;
  • Preparation of the raw material base and its further development;
  • Increase of technological level at the mines;
  • Utmost enhancement of labor productivity and production efficiency on the basis of maximal utilization of the inner resources, every kind of production intensification, and introduction of advanced processes;
  • Increase of quality of the ore mined;
  • Prime cost reduction of the ore mining and stripping work.

 

Click to listen highlighted text! Powered By GSpeech