AMMC Production Indicators for 7 Months

07 August 2025, 9:44 895

Almalyk Mining & Metallurgical Combine has ensured the fulfillment of all production forecasts for 7 months of 2025. The forecast for the production of commercial products was fulfilled by 116.1%.

The growth rate of overburden stripping operations at the “Qalmaqqir” mine administration was 114.8%. For copper raw material processing – 100.9%.

The forecast for copper content in concentrate was fulfilled by 105.7% for 7 months. The staff of the Copper Processing Plant (104.8%) and Copper Processing Plant No. 2 (120.8%) showed excellent results.

The production of cathode copper, which is the main product of AMMC, was carried out for 100.5%, including from its own raw materials – for 114.8%.

The growth rate of zinc metal production was 101.7% compared to the same period last year. The forecast for its production from its own raw materials has been fulfilled for 106.8% since the beginning of the year.

All forecast indicators have been fulfilled by the work team of the “Khandiza” mine administration. The extraction of polymetallic ore has been completed by 100.0%, its processing – for 100.5%, the zinc content in zinc concentrate – for 101.2%.

The gold mining divisions of AMMC – the Angren and Chadak mine administrations and the “Kauldy” mine – have also coped with the tasks set. The work teams of these divisions have fulfilled the forecasts for the extraction and processing of gold-bearing ores, as well as for the content of the first and second metal in concentrate.

The forecasts for the production of copper sulfate (100%), technical tellurium and selenium (100% each), ammonium perrhenate (100.6%), palladium powder (102.7%) have been fulfilled.