Call-center
+998 78 141 90 99Helpline
+998 71 619 23 33Over the first 11 months of this year, the labor collective of Almalyk Mining and Metallurgical Complex successfully fulfilled all planned production indicators.
In particular, the production of marketable products reached 119.4 % of the annual target.
The Kalmakyr Mining Administration recorded a 103.9 % growth rate in ore extraction.
The processing of copper raw materials also demonstrated strong progress, with a 104.6 % growth rate.
Similarly, the copper content in concentrate showed an increase of 102.0 %.
The accomplishments of both the Copper Concentrator Plant and the Copper Concentrator Plant-2 deserve special recognition for their key role in achieving these indicators.
The recently commissioned Copper Concentrator Plant-3 also made a significant contribution to fulfilling targets related to copper raw material processing and copper content in concentrate.
The production forecast for copper cathodes, the complex’s main product, was fulfilled at 100.3%, with a growth rate of 107.0%.
The task of producing copper cathodes from domestic raw materials was completed at 106.7%.
Additionally, zinc production reached 100.4% of the target, zinc produced from domestic raw materials reached 100.0%, sulfuric acid production amounted to 100.3% of the planned forecast.
At the Khondiza Mining Administration in the Surkhandarya region, the workforce achieved 100.0% in polymetal ore extraction, 100.7% in ore processing, 102.5% in zinc content in concentrate.
Likewise, the labor teams of the Angren, Chadak, and Kauldy mines successfully fulfilled their forecasts for extraction, processing, and concentrate production of gold-bearing ores and 1st and 2nd metals.
Planned results were also archived in the production of copper sulfate, technical selenium and tellurium, ammonium perrhenate, palladium powder, and other products.
AMMC Department of Budgeting and Cost Control