• Call-center

    (+998 78) 141-90-99
  • Call-center

    (+998 78) 141-90-99

AMMC: Results of production activities for the first month of 2025

06 February 2025, 15:11 1110

During the first month of the current year, Almalyk Mining and Metallurgical Complex fulfilled all production targets.

In particular, the forecast for the production of commercial products was fulfilled by 107.5%.

The Kalmakyr Mine Administration fulfilled the forecast for ore production by 100%, the growth rate was 100.7%. The forecast for stripping operations was fulfilled by 103.7%.

The growth rate for processing copper raw materials was 106.2%. The workforce of Copper Concentrator-2 fulfilled the assigned tasks by 102.3%.

The forecast for copper content in concentrate was fulfilled by 109.6%, the growth rate was 105.6%. A significant contribution to these indicators was made by the workers of the Copper Processing Plant (109%) and Copper Processing Plant-2 (114%), who successfully coped with the tasks assigned to them.

In addition, the production of cathode copper, which is the main product of the plant, amounted to 102.4% of the planned volume, and the output of cathode copper from its own raw materials reached 122.2%.

The target for the production of zinc from its own raw materials was fulfilled by 102.7%.

The team of the Khandiza Mine Administration in the Surkhandarya region successfully fulfilled all the planned indicators in January. In particular, the forecasts for the extraction of polymetallic ore (100%), its processing (100.1%) and the zinc content in zinc concentrate (100.2%) were fulfilled.

The employees of the Angren, Chadak mine administrations, as well as the Kauldy mine, also fully coped with the tasks set during the reporting period. They ensured the fulfillment of forecasts for the extraction and processing of gold-bearing ore, as well as for the content of the first and second metals in the concentrate.

In addition, the forecast indicators for the production of copper sulfate (100%), enameled wire (100%), technical selenium (100%), technical tellurium (100%), ammonium perrhenate (101.2%) and palladium powder (101.9%) were achieved.

Share your:
Text to speech

Адрес страницы с ошибкой:

Текст с ошибкой:

Ваш комментарий или корректная версия:

Close menu