+998 71 619 23 33During the first two months of this year, the Almalyk Mining and Metallurgical Complex successfully fulfilled all planned production indicators.
In particular, the fulfillment of the forecast for the release of commercial products was 111.3%. The forecast for the copper content in concentrate was fulfilled by 150.9%. A significant contribution to this result was made by the teams of the copper concentrator (104.9%) and copper concentrator-2 (113.5%), which not only coped with the tasks set, but also achieved their overfulfillment.
The stability of copper cathode production figures deserves special attention: for two months and separately in February, the growth rate was 102.4%. The forecast for copper cathode production from own raw materials was fulfilled by 124.2%. The target for zinc production from own raw materials was fulfilled by 104.1%.
The workforce of the “Khandiza” mine group successfully coped with the extraction of polymetallic ore (100%), its processing (100.1%) and the target for zinc content in zinc concentrate (100.4%).
It is also worth specially noting the work of the teams of the Angren, Chadak mine group and the “Kauldy” mine, where the forecasts for the extraction and processing of gold-bearing ores, the content of the first and second metals in concentrate were exceeded.
In addition, plans for the production of such types of products as copper sulfate, enamel wire, technical tellurium and selenium, ammonium perrhenate and palladium powder have been fully implemented.