Рус O'z En
Helpline
Feedback

5-Month Production Results at AMMC

17 June 2025, 10:23 1073

The Almalyk Mining and Metallurgical Complex fulfilled all production forecasts for the first 5 months of this year.

In particular, the task of producing commodity products was fulfilled by 115.5%.

The forecast for processing copper raw materials showed a growth rate of 101.4%. In this direction, such labor collectives as the Copper Concentrator Plant (101.6%) and the 2nd Copper Concentrator Plant (100.1%) also achieved growth rates.

In addition, the forecast for copper metal in concentrate was fulfilled by 105.5%, and the growth rate was +100.2%. In this direction, the Copper Concentrator Plants and the 2nd Copper Processing Plants also fulfilled their tasks with excellence.

The forecast for the production of copper cathodes, the main product of the combine, was also fulfilled by 100.7%.

The task of producing copper cathodes from our own raw materials was achieved by 118%, and zinc production by 105.5%.

The Khondiza Mining Department located in the Surkhan Oasis ensured the fulfillment of tasks such as mining (100.0%) and processing (100.4%) of polymetallic ores, zinc in zinc concentrate (101.0%).

Also, the labor teams of the Angren Mine Administration, Chodak Mine Administration and Kauldy Mine Administration diligently fulfilled tasks such as mining and processing gold-containing ores, and metals 1 and 2 in concentrate.

The tasks of producing products such as copper sulfate (100%), selenium (100%), tellurium (100%), ammonium perrhenate (100.6%), and palladium powder (102.8%) were also ensured.

Department of Budgeting and

Expenditure Control of Almalyk MMC

Share your:
Text to speech