Call-center
(+998 78) 141-90-99Helpline
(+998 71) 619-23-33In 2024, the workforce of the Almalyk Mining and Metallurgical Complex fulfilled all the forecast indicators.
In particular, during the reporting period, commidity products were produced in the amount of 38,149,318,936,000 soums, the the forecast indicator was fulfilled by 116.1%
Consumer goods worth 7.5 mlrd. Soums were also produced.
The Kalmakyr Mining Administration fulfilled its ore mining target by 101.6%, with a growth rate of +104.6%.
The forecast for copper raw material processing was fulfilled by 100.1%, with a growth rate of +101.6%. In this area, Copper Concentrator Complex-2 fulfilled its target by 100.7%.
The forecast for the production of the complex's main product, cathode copper, was fulfilled by 100%. The target for the production of cathode copper from its own raw materials was fulfilled by 107.4%, with a growth rate of +104.1%.
The forecast for copper content in concentrate was fulfilled by 103.1%. The Copper Concentrator Complex fulfilled this target by 104.2%. The target for zinc production from its own raw materials was fulfilled by 117.1%.
The tasks for the extraction of polymetallic ore and its processing by the employees of the Khandiza mine administration were completed by 100,5%, and for the zinc content in zinc concentrate – by 106,7%.
In the work teams of the Angren and Chadak Mine Administrations and the Kauldy mine completed tasks for the extraction of gold ore, its processing, and the content of the first and second metals in the concentrate.
In addition, forecast indicators for the production of copper sulfate, enamel wire, technical selenium and tellurium, ammonium perrhenate, palladium powder, and sulfuric acid have been achieved.
Адрес страницы с ошибкой:
Текст с ошибкой:
Ваш комментарий или корректная версия: