Call-center
+998 78 141 90 99Helpline
+998 71 619 23 33Based on the results of 2025, the workforce of the Almalyk Mining and Metallurgical Complex fully ensured the fulfilment of all production targets.
The total volume of industrial output amounted to 51.6 trillion soums, corresponding to 119.8% of the forecast. Production of consumer goods reached 7.49 billion soums, with the forecast indicator fulfilled at 119.7%.
During the reporting year, high growth rates were recorded in copper ore mining (104.6%) and copper raw material processing (105.3%).
The production target for cathode copper, which is the key product of the AMMC, was fulfilled in full (100%). At the same time, production of cathode copper from own raw materials exceeded the forecast and reached 104.9%.
Annual targets for zinc production were met at 104.2%, including zinc output from the Complex’s own raw materials ensured at 100.4%.
Forecast targets for the mining of polymetallic ores (100%) and their processing (100.7%) were achieved. Tasks related to the mining and processing of gold-bearing ores were also fully accomplished.
Forecast indicators for the production of following products were also met: copper sulphate, technical selenium and tellurium, ammonium perrhenate, palladium powder and sulphuric acid.
AMMC Department of Budgeting and Cost Control